Christchurch Boys’ High School

Related Systems: Ultratherm Xtreme
Ultratherm MSR
Project Size: 2,000 m2
Location: Christchurch
Project Date: January 2018
Architect: Jasmax
Main Contractor: Southbase Construction
Installer: SWP Commercial

The historic Hall building at Christchurch Boys’ High School was significantly damaged during the Canterbury Earthquakes and a replacement assembly hall was completed in 2018.

Awards
  • 2018 NZIA Local Awards – Education

[su_image_carousel source="media: 3519,3520" limit="20" slides_style="minimal" controls_style="dark" crop="1:1" columns="4" adaptive="yes" spacing="yes" align="none" max_width="none" captions="no" arrows="yes" dots="no" link="lightbox" target="blank" autoplay="0" speed="medium" image_size="medium_large" class=""]